Genaral Information
The forum on "Quang Ngai - Potential and Investment Prospect"
Potentialities
Project Profiles
Pre-Feasibility Study
Investment Holder Quang Ngai Tourism Company
Summary Account of Feasible Project Building Cultural Tourism park Thien
but
Dung Quat Industrial Estate
- Total area: 5129.1 Km2
- Population (1997): 1257000
- Town centre: Quang-ngai
- Administrative unit: 12 Districts 01 Town
- Average degree (1997): 26.1oC
- Total rain quatity (1997): 2155 mm
- Ralitively moisture degree (1997): 84%
Potentialities
Quang ngai is one of provinces in the key economic areas of the central
Viet nam having National Highway No1A and Trans - Viet Railway going paralelly
along the length of the province and National highway No 24 - an important
east-western rout.
With 130 Km length of coast in the west; Dung-quat Bay in the north with
the total area 30 km2 13-20 m deepth being invested to construct a deep-sea
port in large scale of the country. The ability of sea-economy development is
an important strong point of the province.
Most of Quang ngai soil is favourable for long-term industrial plants
special fruit trees and medical tree. Downstream watershed fat lands are
favorable for planting rice short- term industrial plants and vegetables .
Quang-ngai also has a lot of mineral resources: Graphite with 4 million
tons in reserve (2.5 million tons exploitable) average carbonic volume of 20%;
1 million tons of silimanite ore; 476000 m3 of coal slime; 4 millions tons of
kaolin ...
Quang-ngai has historical relics with old-age historical heritages such as
Sa- huynh relics ancient Cham cultural sites well-known historical memorials
such as Ba-To Son-My Van-Tuong and several good seashores such as Khe-Hai My-
Khe Minh-Tan Sa-Huynh ... offerring good conditions to develop tourism.
Socio-Economic situation
The GDP growth in the period of 1991-1997 is 903% in which agriculture
growth is 393% the industry growth is 1725% and services is 1231% .
The economic growth in the period 1998-2000 is estimated at the rate of
15/% ; The GDP per capital in the year 2000 will be 350 USD.
Economic structure 1997
Estimating economic structure in 2000
The average Highway transportive network is 0.25 km/ km2. Main routs:
National highway No 1A: Rout in provincial area is 83 km long.
National highway No 24A rout form Thach- tru to Kon- tum is 69 km National
24B rout is 18 km long.
Provincial rout includes 6 routs with the total length of 179 km.
Trains- Viet railway goes through along the length of the province.
Using the national electric power system. Heater- power plant (providing)
with the capacity 8 MW. The heater- power plant in Dung-Quat is going to be
constructed with the capacity 300 MW .
With the telecomunicative network of the province the station NEAX having
10500 telephones assemblied in the centre of the province to gether with
automatic station in districts and VIBA transfer station it is guaranted to
convey information rapidly .
Quang - ngai town water network is upgraded with the capacity of 20000
cubic meters/24 hrs.The water supplying networks shall be constructed in lagre
scale for Dung - Quat industrial Zone with the capacity 115000 cubic meters/24
hrs and 300000 cubic metres/24 hrs.
Programs of popular primary education was carried out in the whole of the
provice There are primary and secondary schools in most of the provincial
villages. In the school year 1996-1997 in the whole province the number of
students and pupils being trained accounts 23% of the total population.
The rate of doctor per 10000 inhabitants is 2.7.
Covering brocasting television brocasting wave in the whole province
Introduction of Thach- Nham Irrigation Network
- Area of irrigation: 50000 ha.
Chanel system:
- Nothern main chanel: 30.3 Km; Qtk = 23.5 m3/s; Ft = 22500 ha
- Southern main chanel: 35 km; Qtk = 31.5 m3/s; Ft = 27500 ha
- The first level chanel system: 22 chanels 183.5 km long
- Other chanel system: 950 km long.
- Influential area: 6 Districts and Quang Ngai Town.
Development Orientation
Step by step developing Industrialization and modernization of the economy
developing the socio- economy of Quang-ngai provice together with the key
economic area of the central especially Dung-quat industrial Zone .
Estimating economic structure in 2010
Agriculture
Developing completly agriculture forming specializing cultivating areas of
mass production gradually agricultural industrialization.
Paying much attention to Food production speeding up industrial trees fruit
trees vegetable; planting cinnamon trees as one of the key tree on mountain
area.
Acquacture shall be expanded. Investment for building fishing ports fishing
villages especially sea-food product processing; Expanding areas of producing
breeds foodstuff and fishery services.
Industry
It shall be focused on development of petro-chemist industry chemical
industry exploiting miners processing industry .... mainly in Industrial Zones.
Service
Developing services to serve demands of forming and development of
Dung-quat industrial zone speeding up tourist technological transfer computer
services expanding financial and banking services.
Dung Quat Industrial Zone
Binh Chanh industrial Estate
Ky Ha industrial Estate
Dung-quat Deep Sea-port
Chu-lai international airport
Van -tuong New city area
Quang Phu industrial zone
Pho Phong industrial zone
Tinh Phong industrial zone
My khe Tourism Resort
Sa Huynh tourism resort
Investment encouragement policy
LIST OF FIELDS WHICH ARE ESPECIALLY ENCOURAGED INVESTMENT
LIST OF MAIN PROJECTS CALLING FOR INVESTMENT
Dung Quat Industrial Zone:
With the total area 14000 ha and situated on the coast line of the Dung
Quat Bay Dung Quat industrial zone has a multiform development orientation
including many new industrial activities in large scales having symbolic trait
of the whole country such as: Oil-refining industry Petrochemical industry
production of products from oil mines with many key works especially the 1st
oil-refinery plant - The main point of the whole economy in locality.
- The First Oil-refinery Plant
- Capital total: USD 1.5 Billion.
- Capacity: 6.5 Million tones/yr (130.000 Barrel per day).
- Total area of land occupied:
Main Plant: 110 ha;
Security corridor for pipe lines: 114 ha;
Port (include the sea surface): 471 ha.
Products: Propylen LPG Gasoline Jet fuels Diesel F.O ...
SPM port for Mammoth tankers 80000-110000 DWT 6 piers accessible for
3000-25000 DWT Vessels.
Petrochemical industrial Estate
The total area is 223 ha mainly for Petrochemical industrial and prodution
of products from oil miner.
Binh Chanh industrial Estate
The total area is about 500 ha priory for high-tech industrial activities
clean technology.
Ky Ha industrial Estate
The total area is 350 ha about 20 Km away from Dung Quat port and it is
estimated to concerntrate high- tech industrial activities.
Dung-quat Deep Sea-port
190 km away from the international waterway designed for ship of
100000-150000 DWT. Including - Break water : 1.5 km
- Dyke for preveting form alluviam: 0.8 - 1 km
- Petro-Port : 5 - 6 Jetties
- Port especially used for stainless steel ;ship building and repairing
- Port of trade and container miternal
Chu-lai international airport
With the total area 2100 ha (3km width 7 km length) Chu-lai airport is one
of 03 airports in the whole country and will be restored by the year 2000 and
developped to become an international airport according to the plan improved by
the Prime Minister.
- The main run way of 3020 m x 45 m
- The Sub-run way of 2800 m x 30 m
Van -tuong New city area
The total area is about 2400 ha and it is estimated to build a new and
modern city - the economic financial and technical scientific centre of the key
area.
Quang Phu industrial zone
The total area is nearly 132 ha. It is estimated to develop electronic
fields manufacturing machine goods for export processing agricultural products.
Pho Phong industrial zone
The total area is nearly 132 ha. It is estimated to develop fields such as
paper; paper powder; construction materials ( Stone wood...)
Tinh Phong industrial zone
Being in the Northern Developing Network of Quang ngai Town Tinh phong
Industrial Zone is in Son-tinh District Quang ngai province 8 km North of the
Central province 20 km away from Dung Quat Industrial Zone and Chu lai Airport.
It has got favourable access to economical centers in and outside the area
bordered in the west by National Highway 1A in the East by National 110KV
electric transmission lines Da nang-Quang ngai. Chanel No B10 of Thach nham
Irrigation system in the East is the safe resource of water supply for the
whole Industrial Zone.
Tinh phong had been planned in order to create a high-benifit Industrial
Zone which shall produce many kinds of construction materials creating a
favourable field for investor to meet the demands of the market especially for
Dung Quat Industrial Zone started at the end of this year. Total area is 142 ha
of which 70% shall be for rent.
Detailing surveys have shown that the Industrial Zone statum is mainly clay
with good bearing capacity ground water has not affect on concrete favourable
for building constructions.
Encouraged main investment sectors
- Building and trading in infrastructure facilities;
- Manufacturing building materials; including ceramic furniture synthetic
materials …
- Supplying technical and technological services especially high-tech;
services on manufacturing repairing assembling equipments consumption goods.
- Other industrial goods in place of import goods and for export (except
foodstuff industries and those banned to Industrial Zone investment ).
The First stage of Tinh Phong IZ
According to the Decision of the Prime Minister the first stage of Tinh
phong Industrial Zone has been planned with total area of about 47 ha covering
33% of the whole approved Industrial Zone are:
Total area of lots for rent is about 3274ha accounting for 70% of the whole
area:
1- Lot No V : area 979 ha
2- Lot No VI : area 1455 ha
3- Lot No IX : area 330 ha
4- Lot No X : area 510 ha .
Necessary infrastructure constructions in this stage shall be built with
total invested capital of about VND mil 922 .
Estimated main plants to be built and operated in the first stage
1.Tunnel brick plant with the capacity of 15 mil bricks per year (being
operated) .
2. Van tuong Cement plant with the capacity of 100.000 tons per year (being
operated) 3. Light concrete plant
4. Sanitary ware plant
5. Face brick field
6. Ceilings wallboard and interior decoration plant
7. Structural stone plant
8. Synthetic paint plant
9. Construction machinery plant
10. Wooden furniture plant
11. Steel plant
12. Fresh concrete station precast concrete component
13. Construction materials; Container terminals.
My khe Tourism Resort
With the total area 420 ha 20 Km away from Dung Quat port 01 Km long and 60
m wide beach My Khe is one of beautiful and safe beaches of the central - very
good for hotel restaurants tourism and entertainment services.
Estimated tourist services
- Ecological-environment tour
- Beaches and resorts.
- Entertainment recreations and sports (Boating sailing surfing).
- Excursions and field trips ( to historical relics and beautyful scenaries
).
- Tours ewiht marine special dishes.
Sa Huynh tourism resort
About 60 Km away from the central of Quang Ngai to the South with the total
area 30 ha Sa Huynh is estimated to form a good beach for relax entertainment
combining visiting Sa Huynh archaeological site ...
Investment encouragement policy
- Encouraging establishment of enterpries operating fields of
infrastructure development in Industrial zones in cities. Provincial people's
committee is in charge of combining with central ministries to guarantee
supports of capital to build technical infrastructures to defence of industrial
zones or to enterpries.
- Provicial people's committee is in chage of directing the establishment
and implemention site- cleance plan to give investors land .
- Enterpies investing according to Law on foreign investment in the
province are enyoyed preferential policies; exemption and reduction land-lease
like enterpries operating according to Law on domestic investment .
- Applying the rate of profits tax 10 % to enterpries having foreign
capital during the investment duration .
- Beeing exempted from profits tax for 4 - 8 years commencing from the
first profit-making year and beeing guaranteed a fifty (50 %) per cent
reduction of profits tax for next four (4) years depending on every projects.
LIST OF FIELDS WHICH ARE ESPECIALLY ENCOURAGED INVESTMENT
- Projects for export of 100% of products
- Projects for the production of high quality international standard
economically efficient new breeds or cross-breeds of animals
- High added - value labour intensive projects which process domestic
agricultural forestry and fishery products for export
- Projects for the prodution of new or rare precious metals; those
involving new bio - technology electronic technology; new technology
manufactuing communication and telecommunicative equipment; informatics
technology
- Export - processing businesses and high - tech industrial businesses in
industrial Zones Export- Processing Zones and high - tech Zone
- Projects for the treatment of invironmental pollution and protection and
waste treatment and processing
- Project under Build Operation Transfer Build Trasfer Operation and Build
Transfer contracts.
LIST OF MAIN PROJECTS CALLING FOR INVESTMENT
A - Agriculture:
1 - Project of planting and processing Cinnamon
2 - Project of developing Rubber trees
3 - Project of cultivating Shrimps for export.
4 - Project of raising cows
B - Industry - Construction:
I - Infrastructure construction:
1 - Project of building and operating infrastructures in industrial groups
0f Dung Quat industrial zone ( Ky Ha industrial Estate Binh Chanh industrial
Estate Binh Thanh industrial Estate Petrochemical industrial Estate).
2 - Project of building and operating infrastructure in Tinh- Phong
industrial zone.
3 - Project of building and operating infrastructure in Quang- Phu
industrial zone.
4 - Establishing inhabitant and specialist area in Van Tuong city
5 - Constructing water supply system to Dung Quat industrial zone at the
second stage: 115000m3 / 24 hours.
6 - Constructing water supply system to Dung Quat industrial zone at the
third stage: 300000m3 / 24 hours.
7 - Assemblying waste water treatment system for the whole Dung Quat
industrial zone.
II- Heavy industry:
1 - The 1st oil - refinery plant.
2 - Petro - chemist plant
3 - Steel plant
4 - Building a power plant with capacity 300 MW
5 - Ship building and repairing plant
6 - Exploiting and selecting Graphite
III- Chemical industry:
1 - Production of Ferlizer
2- Production of Polypropylen
3 - Production of Carbon paper
4 - Production of Synthetic paint plant
5 - Production of Chemist
IV - Construction material industry:
1 - Production of Granite stone
2 - Production of spongy concreat brick
3 - Assemblying motor devies
4 - Production Alluminium- Bar
6 - Production of building stone
V- machinery Industry:
1 - None- standard steel products
2 - Container Construction materials
3 - Assembly motor parts
4- Production of equipment and accessories for factories producing
construction materials
VI- processing industry :
1- Processing agricultural products
2- Processing fishery products
VII- Electronic and other industries:
1- Production and assembly electronic devices
2- Production remarkable stamp by Lazer
3- production nilon-bag
4 - Production of leather shoes for export
C- Service:
1- Building Thien-an hotel
2- Construction of Mini hotel group at My-khe
3- Construction Camping area in My-khe tourism resort
4- Construction cultural and tourism area in Thien-But Park
Dung Quat Industrial Zone
Binh Chanh industrial Estate
Ky Ha industrial Estate
Dung-quat Deep Sea-port
Chu-lai international airport
Van -tuong New city area
Quang Phu industrial zone
Pho Phong industrial zone
Tinh Phong industrial zone
My khe Tourism Resort
Sa Huynh tourism resort
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
THE PROJECT TO PRODUCE CARBON BLACK
FOREWORD
In November 9 th 1994 The Prime Minister of Socialist Republic of VietNam
has issued the Decision No 658/TTg on choosing the location for the first oil
refinery of VietNam at Dung Quat area Binh Son district of Quang Ngai province.
In July 10 th 1997 the Prime Minister has given the decision No 514/TTg on
investing Dung Quat first oil refinery with the capacity of 65 million
tons/year at BinhTri village Binh Son district Quang Ngai province. This makes
a jump-start in the construction and the development of Dung Quat Industrial
Estate.
This decision is on the intention to set up a large - scale union
industrial estate in the central region of Viet Nam. This union industrial
estate includes: The oil refinery plant Petrochemical plants The union steel
and rolling mills Ship building and repairing Plant light industrial Plant
mechanical equipment production Plants and new modern town of Van Tuong with
the population of 12.000 in service of the development of this Estate directly.
The chemical products from gas and oil (they are usually called
"petrochemical products") are very diversified and abundant sharing
90% of organic products which are produced. The raw material source which
produces petrochemical products is natural gas fluidization gas crude gasoline
segment (Naphta). Therefore on the feasibility study report of the Dung Quat
first oil refinery plant after-refining products include the products which are
used to produce petrochemical products.
In parallel with constructing the oil refinery plant the construction of
petrochemical plants is also executing together with a plentiful raw material
source from the oil refinery plant and a large domestic market are firm
guarantees to invest to construct petrochemical plants.
FOREWORD
THE BASES OF THE PROJECT
GENERAL ABOUT LOCATION AND
INFRASTRUCTURE WORKS IN THE AREA
BASIC CONTENTS IN THE PROJECT
ORGANIZATION - IMPLEMENTATION -
CONCLUSION
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
---------------------------------------------------------------------------
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
THE PROJECT TO PRODUCE CARBON BLACK
THE BASES OF THE PROJECT
1. General about the consuming status of Carbon Black in the past years:
- Carbon Black is an important product as reinforcement material of the
rubber use and pigment of plastic ink and coating. Especially Carbon Black is
an essential product for automobile and tire industries.
- Carbon Black demand in Viet Nam is projected to reach 30000 tons by the
year 2000 predicting the high average annual growth rate of the demand over
15%.
However at present Carbon Black is imported from region countries because
there is no production services in Viet Nam.
As the above statistics We can see that the domestic market of
Polypropylene product is really potential.
2. Raw material:
- The method is commonly used to produce Carbon Black: by using bottom oil
from the RFCC of the 1st crude oil refinery as feedstock.
- According to the feasibility study report of the first oil refinery plant
in the first period the capacity of this plant is 6.5 million tons/year in
which the bottom oil products shares a high proportion (3.93%).
Therefore using the investment ability of modern and high - tech process to
construct a Carbon Black production plant at Dung Quat industrial Zone is
feasible.
FOREWORD
THE BASES OF THE PROJECT
GENERAL ABOUT LOCATION AND
INFRASTRUCTURE WORKS IN THE AREA
BASIC CONTENTS IN THE PROJECT
ORGANIZATION - IMPLEMENTATION -
CONCLUSION
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
----------------------------------------------------------------------------
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
THE PROJECT TO PRODUCE CARBON BLACK
GENERAL ABOUT LOCATION
AND INFRASTRUCTURE WORKS IN THE AREA
I. Location:
In the zoning the designed area with the total area of 223 ha is located in
the East of Dung Quat Industrial Zone on the territories of Binh Tri village
and Binh Thuan village of Binh Son district Quang Ngai province 2 Km from the
oil - refinery plant.
- The designed area includes ranges of hills inserted with rice fields and
villages (these villages are near hills). The average elevation of ground level
is 15m with good geology.
- At the study area the average annual temperature is 2507C the average
moist level is 28.7 mb average annual velocity of wind is 2.9 m/s the total
radiation in the whole year is 143.3 Calo/Cm3.
- Most of residents here are farmers with low income.
- Land distribution structure:
+ Rural land shares: 4.4%
+ Orchard land shares: 6.7%
+ Rice - field land shares: 16.7%
+ Lake and pond’s surface land shares: 66.6%
+ Hill and mountain land that has not used yet shares: 5.6%
In short the study area is now mainly agricultural land: sparse population
and large land’s fund are advantages for industrial construction.
II. Technological infrastructure system:
1. Power supply:
The study area is supplied power from the national power net passing the
Dung Quat transformer 450 kWh/ha.
2. Transportation:
The designed area is surrounded by 3 routes:
+ The Doc Soi - Tra Bong bridge - Dung Quat port - Oil refinery plant route:
203 Km long
+ The Binh Long - Van Tuong - Oil refinery plant route: 9.16 Km long.
+ The Eastern route is inner the Industrial zone linking the oil refinery
plant with Dung Quat port.
+ 3 Km away from the west: Dung Quat port can be accessible for ships of
heavy load in service of oil - refinery and petrochemical industry and
comprehensive commodity.
+ Chu Lai International airport: 15 Km from the North.
+ The National Highway 1A route and the trans-Viet Nam railway: 10 Km away
from the west.
+ The new Town of Van Tuong serves for Dung Quat Industrial Zone: 8Km away
from the south.
3. Water supply:
The designed area will be supplied water by the water plant of 115.000
m3/day capacity. At first the water plant of 15000 m3/day capacity will supply
water for this area by the water pipeline system to the fence of the plant.
4. Communication network:
This area is covered wave from the National communication network insuring
through communication being convenient in Viet Nam and abroad.
FOREWORD
THE BASES OF THE PROJECT
GENERAL ABOUT LOCATION AND
INFRASTRUCTURE WORKS IN THE AREA
BASIC CONTENTS IN THE PROJECT
ORGANIZATION - IMPLEMENTATION -
CONCLUSION
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
-----------------------------------------------------------------------------
-------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
THE PROJECT TO PRODUCE CARBON BLACK
BASIC CONTENTS IN THE PROJECT
I. Project tittle:
The project to produce Carbon Black
II. Project scale:
- Planned capacity: 30000 Tons/year.
- Total investment cost :about USD 30 million.
III. Main conditions:
- The most advanced technology for Carbon Black production will be selected
to produce Carbon Black with high quality to supply for automobile and plane
industries
- Planned land area :6 ha
- Start - up Date: by the year 2000
- Location: The Petrochemical development area at Dung Quat Industrial Zone
.
- The Carbon Black product will be supplied to Vietnamese domestic market
at first to support the related industries and the remainder will be exported
overseas.
- Raw material: the capacity of the plant is 30000tons/year using the
material source of bottom oil from the Oil-refinery plant.
IV. Investment form:
- Joint stock corporation
- Contractual Joint Venture
- Foreign wholly owned enterprises
V.Finance and estimated benefit:
1.Finance:
- Total investment capital: USD 28.5 million
In which:
+ Installation: USD 4.5 million
+ Equipment: USD 20 million
+ Other basic construction: USD 2 million
+ Working capital: USD 2 million
2.Economic benefit of the project:
- Economic evaluation period: 15 years
- Annual turnover: USD 15.8 million
- Internal rate of return (IRR) : 19.4%
- Projected time for reimbursement:9 years
VI. Vietnamese counterpart:
- Vietnam Chemical Corporation
- Petro Vietnam
FOREWORD
THE BASES OF THE PROJECT
GENERAL ABOUT LOCATION AND
INFRASTRUCTURE WORKS IN THE AREA
BASIC CONTENTS IN THE PROJECT
ORGANIZATION - IMPLEMENTATION -
CONCLUSION
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
THE PROJECT TO PRODUCE CARBON BLACK
ORGANIZATION - IMPLEMENTATION - CONCLUSION
I.Organization and implementation:
- All related partners will have a meeting at Dung Quat Industrial Estate
Authority to discuss and to sign the memory agreement.
- Estimating the construction factors and making the pre-feasibility study
and feasibility study.
- Submitting the feasibility study and joint venture contract for approval.
- Preparing for Carrying out.
- Construction duration: in 12 months.
II. Conclusion:
The project to construct the Carbon Black production plant at Dung Quat
Industrial Zone is one of the projects which the Government of Viet Nam
encourages to invest; Together with the potential raw material source from Dung
Quat oil refinery plant a large domestic market are firm guarantees for
investors with high feasibility.
FOREWORD
THE BASES OF THE PROJECT
GENERAL ABOUT LOCATION AND
INFRASTRUCTURE WORKS IN THE AREA
BASIC CONTENTS IN THE PROJECT
ORGANIZATION - IMPLEMENTATION -
CONCLUSION
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Home : Dung Quat : The project to produce Carbon Black
--------------------------------------------------------------------------------
THE PROJECT TO PRODUCE CARBON BLACK
ORGANIZATION - IMPLEMENTATION - CONCLUSION
I.Organization and implementation:
- All related partners will have a meeting at Dung Quat Industrial Estate
Authority to discuss and to sign the memory agreement.
- Estimating the construction factors and making the pre-feasibility study
and feasibility study.
- Submitting the feasibility study and joint venture contract for approval.
- Preparing for Carrying out.
- Construction duration: in 12 months.
II. Conclusion:
The project to construct the Carbon Black production plant at Dung Quat
Industrial Zone is one of the projects which the Government of Viet Nam
encourages to invest; Together with the potential raw material source from Dung
Quat oil refinery plant a large domestic market are firm guarantees for
investors with high feasibility.
FOREWORD
THE BASES OF THE PROJECT
GENERAL ABOUT LOCATION AND
INFRASTRUCTURE WORKS IN THE AREA
BASIC CONTENTS IN THE PROJECT
ORGANIZATION - IMPLEMENTATION -
CONCLUSION